NEW QUESTION 1
A validation plan is used to do which of the following? (Select all that apply.)

  • A. Verify the design
  • B. Verify that the system is functional
  • C. Verify that the system meets requirements
  • D. Meet current best practices

Answer: ABC

NEW QUESTION 2
A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.
In this scenario, when two source types are supported? (Choose two.)

  • A. powered-off Windows Server 2008 physical machine
  • B. powered-on Windows Server 2000 Workstation virtual machine
  • C. powered-off Windows Server 2008 Workstation virtual machine
  • D. powered-on Windows Server 2008 physical machine

Answer: CD

NEW QUESTION 3
A company has requested assistance with a new cross-site failover design to support business-critical applications.
• It has two sites when are very well-connected, and latency is less than 5ms round trip.
• The customer requires that its applications be restarted even in the event of a total site failure.
• The applications must be kept online even when migrated during maintenance.
• Storage arrays at either site support both synchronous and asynchronous replication. Which two options are accurate application requirements for this scenario? (Choose two.)

  • A. The design must ensure continuous application uptime even during a total site failure.
  • B. The design must prioritize application availability.
  • C. The design must ensure application recoverability at the second site.
  • D. The applications are latency-sensitive.

Answer: BC

NEW QUESTION 4
Customer Requirements:
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has produced two 24 port FC switches, and Asymmetrical Active/Active storage array (2 storage Processors with 4 ports each) and 22 ESXi Hosts with 2 dual port HBAs in each. Due to budgetary constraints, the organization cannot purchase anymore equipment. They have provided the following requirements:
- The existing Fibre Channel (FC) Asymmetrical Active/Active Array and FC switches must be used.
- No single point of failure to any datastore.
- Configuration must provide failover and load balancing.
- The customer requires a solution that will accommodate virtual machines with three different I/O load requirements:
- Static web virtual machines
- Critical application virtual machines.
- Object storage for their database virtual machines. Design Requirements:
Create a logical design that be applied to each of the ESXi Hosts. The design should meet, but not exceed the customer’s requirements and should include:
- All required hardware
- All required resources
Place the required datastore(s) in the storage array(s). Connect the storage processor(s) to the storage array(s). Connect the switch(es) to the storage processor(s) and HBA(s). Connect the ESXi host to the HBA(s) and Path Selection Policies.
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Check below for answer solution
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

NEW QUESTION 5
Customer Requirements:
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization wants three defined virtual machine performance levels:
- Gold Tier – High workload VMs
- Silver Tier – Medium workload VMs
- Bronze Tier – Development workload VMs
The organization has eight ESXi hosts that can be used in the design. Five of the hosts are older “medium performance” hosts, while the last 3 are newer “high performance” hosts that provide better resources when compared to the other hosts. The organization has provided a list of requirements that the design must meet:
- Gold Tier virtual machines should run only on high performance servers, unless no high performance servers are available. They should also be allocated 75% of overall available resources regardless of placement.
- Silver Tier virtual machines should run only on medium performance servers, unless no medium performance servers are available. They should also be allocated 25% of overall available resources regardless of placement.
- Bronze Tier virtual machines should run only on medium performance servers. They should also receive a 35% subset of resources from those allocated to the Silver Tier.
Design Requirements:
Create a logical design that shows resource allocation and cluster policies needed to meet the customer’s requirements. The design should include:
- All required server(s)
- All required resource(s)
Place host(s) in the required DRS group(s). Place virtual machines in the appropriate resource pool(s). Connect parent to child resource pool connector(s) where needed. Connect the appropriate affinity connector(s) where needed.
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Check below for answer solution
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

NEW QUESTION 6
A solution architect has been tasked with designing a new environment for a company's growing needs, and has obtained this information:
• Uptime is critical during regular business hours when 95% of the transactions occur. Application uptime must be 99.9% during those hours.
• In a true Disaster, the business can withstand a day of data loss and half a day of downtime.
• The company is one year into a 5-year contact with the co-lo data center.
• The building that is currently occupied no hanger has any floor space available, but the company has 3 empty racks of space. The co-lo can provide up to 11KVA of power per rack.
• There are current contacts with Dell to provide servers and with Cisco to provide the network components.
• The network team has standardized on an end-to-end 10Gb network.
Based on this information, what are two requirements for the new design? (Choose two.)

  • A. RTO of 24 hours.
  • B. RTO of 12 hours.
  • C. The application must be available 99.9% during business hours.
  • D. 11KVA of power is available per rack.

Answer: BC

NEW QUESTION 7
When configuring HA, which admission control policy should be used?

  • A. Host Failure Cluster Tolerates
  • B. CPU and Memory Percentage for Failover
  • C. Standby Host
  • D. None of the above

Answer: B

NEW QUESTION 8
A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:
• The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.
• The new severs have a 90-day delivery time.
• A data center for disaster recovery has been selected, and it is 20 miles way and connected by MPLS.
• The security team will continue to utilize its current investments and VM Encryption for the new environment.
• The backup team currently uses Data Domain, and reports show an 8.1 compression and deduplication ratio for backups.
Based on the information obtained, which two statements are assumptions for the new design? (Choose two.)

  • A. MPLS will be used to connect the two data centers.
  • B. There is 180 days left of current capacity.
  • C. Data Domain will get an 8:1 compression and deduplication ratio with the new workloads.
  • D. A disaster will NOT affect both data centers.

Answer: BD

NEW QUESTION 9
Customer Requirements:
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has provided a number of Business Continuity and Disaster Recovery (BC/DR) requirements to meet their established Service Level Agreements (SLAs). The preliminary design will include two sites.
Production Site:
- 6 ESXi hosts in two clusters
- A Fiber Channel storage array with three types of storage:
1. Flash storage
2. 15K SAS drives with vFlash Read Cache
3. SATA drives in RAID 5 configuration Secondary Site:
- 3 ESXi hosts in a single cluster
- A Fiber Channel storage array of the same type and with the same configuration as that of the production site The details of the organization’s SLAs include:
- Gold: Maximize read/write storage performance and provide automated offsite recovery with an RPO < 15 minutes.
- Silver: Maximize read performance and provide automated offsite recovery with an RPO from 15 minutes to 24 hours.
- Bronze: No performance requirement. Onsite recovery with no specific RPO.
The organization has a number of web-based multi-tier applications that are governed by their SLAs. The workloads in these applications and their SLA assignments include:
- Database workloads – Gold
- Application workloads – Silver
- Web workloads – Bronze
Note that Web servers only contain static information that is site specific. Design Requirements:
Create a design that incorporates the required elements:
- Place an SLA container for each of the appropriate SLAs into the appropriate sites.
- Place the appropriate storage type(s) for each SLA into the SLA container.
- Place the appropriate workload(s) into the SLA containers.
- Place the appropriate BCDR components into the SLA containers.
- Connect any replicated storage between the two sites using the appropriate replication connector.
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Check below for answer solution Primary
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
Secondary
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit
3V0-624 dumps exhibit

NEW QUESTION 10
You have been tasked with creating a vSphere 6.5 design for an organization. The customer wants to ensure isolation in the network but does not know when to incorporate physical networks, VLANs and PVLANs.
Evaluate the design requirement and determine the isolation method to satisfy the design.
Match each Design Requirement on the left by dragging the red Requirement buttons (R1-R5) over the text of the appropriate Isolation Method.
NOTE: Multiple Design Requirements may fit each Isolation Method.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 11
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has provided information via requirements gathering. Evaluate each statement and determine if the requirement is functional or non-functional.
Match Requirements on the left by dragging the red buttons (R1-R9) over the text of the appropriate Classification.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 12
A company's CTO is very concerned about web server outages that are caused by server hardware failures. Which feature can protect the web server virtual machine from this kind of outage?

  • A. vCenter High Availability
  • B. Proactive High Availably
  • C. High Availability Orchestrated Restart
  • D. High Availability Admission Control

Answer: B

Explanation:
http://www.vmwarearena.com/vsphere-6-5-high-availability-new-features-proactive-ha/vSphere 6.5 High Availability (HA) now also detect the hardware conditions of the ESXi host and allow you to evacuate the Virtual machines before the hardware issues cause an outage to Virtual machines with the help of Proactive HA.

NEW QUESTION 13
A company has one data center site running 50 hosts and 400 virtual machines and requires a vSphere 6.5 design.
1. The CIO wants to add a secondary site for Disaster Recovery (DR) with A hours RPO.
2. The application developer is concerned about anticipated growth as several new projects begin.
3. The CISO is worried about data leaks and theft.
4. The CTO would like to buy new servers with better specifications and higher consolidation ratio.
Determine the critical requirements for each of the key stakeholders. Some requirements might have more than one stakeholder.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Client CIODisaster RecoveryBusiness ContinuityData IntegrityClient CTOCostPerformanceClient DeveloperPerformance

NEW QUESTION 14
A company provides critical financial and statistical data for several major banks.
• The company ensures that the bank's customer data is secure and that analytics data is available when needed.
• Customers rely on this data before making crucial business and financial decisions.
• Just a few minutes of downtime can result in loss of revenue and trust.
• To meet high-availability requirements, the company's IT infrastructure components must be redundant.
• The company established three data centers across the globe and interconnected them with high-speed WAN links.
• Due to the rapid growth of its customers and their increasing demands, the compute, network, and storage
were procured and managed by the company's enterprise system administrators group. What are its two key challenges? (Choose two)

  • A. Data centers across the globe possess manageability problems.
  • B. Availability of business applications must be ensured.
  • C. Regulatory requirements must be met.
  • D. Hardware-defined data centers have limitations.

Answer: AD

NEW QUESTION 15
A customer is using a vSphere APIs for Storage Awareness (VASA) compatible storage array. The VASA provider is published as a virtual appliance.
To ensure recoverability, where must the VASA prowler and vCenter server virtual machines be stored?

  • A. The VASA provider and vCenter Server will be placed on the standard datastore (VMFS, NFS).
  • B. The VASA provider and vCenter Server will be placed on the vVol datastore.
  • C. The vCenter Server will be placed on the vVol datastore and the VASA provider will be placed on the standard datastore (VMFS, NFS).
  • D. The VASA provider will be placed on the vVol datastore and the vCenter Server will be placed on the standard datastore (VMFS, NFS)

Answer: A

NEW QUESTION 16
A customer has these requirements for storage:
• Protocol used must have a file based access.
• Protocol used must have built in native multipathing.
• protocol used must support authentication.
To meet these requirements, which protocol should be used for storage?

  • A. NFS v3
  • B. NFS v4.l
  • C. FCoE
  • D. iSCSI

Answer: B

NEW QUESTION 17
A global financial company has requested assistance with a new cross-site failover design between two sites which will support business critical applications. Latency between the sites is less than 5ms round-trip.
The company requires:
• application must be restarted quickly in the event of a total site failure
• allow for planned migration during maintenance
• applications must be kept online even when migrated due to planned maintenance Drag each statement to its correct concept
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Risk--> App downtime..
Constraint --> The product of the desing must...
Assumption --> A limited number of storage...
Requirement --> Latency between the two sites...

NEW QUESTION 18
After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?

  • A. A separate VMkernel interface may be configured per target.
  • B. A single VMkernel interface must be selected for all iSCSI targets.
  • C. The vSAN iSCSI Target service always uses all Management VMkernel interfaces.
  • D. The vSAN iSCSI Target service always uses the vMotion network.

Answer: A

NEW QUESTION 19
A company is in the process of deploying a modern video-streaming application.
• The application is able to scale (expand and collapse) its steaming nodes in the form of CentOS 7.x 64bit virtual machines, based on demand.
• This IO-Intensive application has a high CPU demand and generates a significant number of disk operations (IOPS).
• To host the application, the company decided to implement a brand-new VMware cluster with vSphere 6.5
• The company would like a significant reduction in CPU utilization as well as a possible increase in throughput.
Which virtual disk adapter should be recommended for the company's physical design?

  • A. LSI Logic Parallel
  • B. VMware Paravirtual
  • C. BusLogic Parallel
  • D. LSI Logic SAS

Answer: B

NEW QUESTION 20
Drag each option to its appropriate concept.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Risk --> DC facilities are at capacity end...Requirement --> Existing change management guidelines...Constraint --> App licencsing costs must be minimizedAssumption --> vsphere 6.5 features will meet the...

NEW QUESTION 21
You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has provided a number of requirements, resulting in a preliminary vSphere cluster design shown in the Scenario. The organization has purchased additional servers configured with large amounts of resources (i.e. CPU, RAM) that could be integrated into the cluster design. Consider each vSphere cluster design and determine the benefit of adding additional servers to the design.
3V0-624 dumps exhibit
Match the Action on the left by dragging the red buttons (A1-A3) over the text of the corresponding Effect. NOTE: Actions taken might have more than one Effect on the cluster design.
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
3V0-624 dumps exhibit

NEW QUESTION 22
In the vCenter HA configuration below, drag the two correct components to the blank boxes in this diagram. The same component may be used more twice (Choose two.)
3V0-624 dumps exhibit

  • A. Mastered
  • B. Not Mastered

Answer: A

Explanation:
Platform services controller

NEW QUESTION 23
A customer wants to make its data available with a RPO of 10 minutes. Replication to the second data center will be done using the network.
Which type of storage configuration should be used?

  • A. NFS datastore on ESXi 6.0 with vSphere replication appliance 6.0
  • B. VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.5
  • C. vSAN datastore on ESXi 6.0 with vSphere replication appliance 6.5
  • D. VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.0

Answer: B

NEW QUESTION 24
......