aiotestking uk

300-135 Exam Questions - Online Test


300-135 Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

P.S. 100% Correct 300-135 dumps are available on Google Drive, GET MORE: https://drive.google.com/open?id=1A41WbBid6qAvgj4lSRDdo8qGNitx8ULz


New Cisco 300-135 Exam Dumps Collection (Question 3 - Question 12)

New Questions 3

Which of the following is not a characteristic of fast switching?

A. Fast switching reduces a routers CPU utilization, compared to process switching.

B. All packets of a flow, except for the first packet, use the information in the fast cache.

C. It can be enabled with the interface command ip route-cache.

D. Fast switching uses a fast cache maintained in a router's control plane.

E. The fast cache contains information about how traffic from different data flows should be forwarded.

F. Even though the fast switching is enabled, the first packet of a flow is still process switched.

Answer: D


New Questions 4

The implementations group has been using the test bed to do a u2021proof-of-conceptu2021 that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.

Use the supported commands to isolated the cause of this fault and answer the following questions.

On which device is the fault condition located?

A. R1

B. R2

C. R3

D. R4

E. DSW1

F. DSW2

G. ASW1

H. ASW2

Answer: E

Explanation:

On DSW1, VALN ACL, Need to delete the VLAN access-map test1 whose action is to drop access-list 10; specifically 10.2.1.3


New Questions 5

Refer to the Exhibit:

Which output is expected in the blank line for the OSPF adjacency process?

A. DOWN

B. EXSTART

C. EXCHANGE

D. LOADING

Answer: B

Explanation:

You can check the output of "debug ip ospf adj" here:


New Questions 6

A customer network engineer has made configuration changes that have resulted in some loss of connectivity. You have been called in to evaluate a switch network and suggest resolutions to the problems.

PC2 in VLAN 200 is unable to ping the gateway address 172.16.200.1; identify the issue.

A. VTP domain name mismatch on SW4

B. VLAN 200 not configured on SW1

C. VLAN 200 not configured on SW2

D. VLAN 200 not configured on SW4

Answer: D

Explanation:

By looking at the configuration for SW2, we see that it is missing VLAN 200, and the u201cswitchport access vlan 200u201d command is missing under interface eth 0/0:

Topic 3, Troubleshooting EIGRP

18.You have been brought in to troubleshoot an EIGRP network. A network engineer has made configuration changes to the network rendering some locations unreachable. You are to locate the problem and suggest solution to resolve the issue.

R5 has become partially isolated from the remainder of the network. R5 can reach devices on directly connected networks but nothing else. What is causing the problem?

A. An outbound distribute list in R3

B. Inbound distribute lists in R5

C. An outbound distribute list in R6

D. Incorrect EIGRP routing process ID in R5


New Questions 7

Which of the following options represents the correct sequence of DHCP messages after a client initially boots?

A. DHCPREQUEST, DHCPOFFER, DHCPDISCOVER, DHCPACK

B. DHCPDISCOVER, DHCPOFER, DHCPREQUEST, DHCPACK

C. DHCPOFFER, DHCPACK, DHCPREQUEST, DHCPDISCOVER

D. DHCPDISCOVER, DHCPREQUEST, DHCPOFFER, DHCPACK

E. DHCPREQUE5T, DHCPDISCOVER, DHCPOFFER, DHCPACK

F. DHCPDISCOVER, DHCPACK, DHCPREQUEST, DHCPOFFER

Answer: B


New Questions 8

Which of the following is a valid host IPv6 address? (Choose all that apply.)

A. ff02:a:b:c::l/64

B. 2001:aaaa: 1234:456c: 1/64

C. 2001:000a:lb2c::/64

D. 2fff:f:f:f::f/64

E. ff02:33ab:l:32::2/128

F. 2001:bad:2345:a:b::cef/128

Answer: B,F

Explanation: Option B is valid, assuming theres a faulty colon : in the IPv6 Address, just before the last 1, that is: 2001:aaaa:1234:456c::1/64Option F is valid, dispite its odd network mask (128 bits), sometimes used in tunnel links.

Incorrect:

Option A is invalid, since it is a Multicast addressOption C seems to be invalid because the 3rd group of characters includes an l (lb2c), but if it is a 1 instead of an l (faulty scan) and the required options are 3 instead of 2, then this address is still valid (2001:000a:1b2c::/64), because the 4th group of characters would be 0000 (remember that we can represent a continuous sequence of zeros by ::).Option D is definitely invalid since it is a reserved address. As states the IANA online :document about the IPv6 Unicast Global Addresses, the range below is reserved, not allocated to any RIR (Regional Internet Registry): 2E00:0000::/7 IANA 1999-07-01 RESERVED

Reference: http://www.iana.org/assignments/ipv6-unicast-address-assignments/ipv6-

unicast-address-assignments.txt


New Questions 9

The implementations group has been using the test bed to do a u2021proof-of-conceptu2021 that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, and FHRP services, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.

Use the supported commands to isolated the cause of this fault and answer the following questions.

The fault condition is related to which technology?

A. NTP

B. Switch-to-Switch Connectivity

C. Access Vlans

D. Port Security

E. VLAN ACL / Port ACL

F. Switch Virtual Interface

Answer: B

Explanation:

Since the Clients are getting an APIPA we know that DHCP is not working. However, upon closer examination of the ASW1 configuration we can see that the problem is not with DHCP, but the fact that the trunks on the port channels are only allowing VLANs 1-9, when the clients belong to VLAN 10. VLAN 10 is not traversing the trunk on ASW1, so the problem is with switch to switch connectivity, specifically the trunk configuration on ASW1.


New Questions 10

The implementations group has been using the test bed to do a u2021proof-of-conceptu2021 that requires both Client 1 and Client 2 to access the WEB Server at 209.65.200.241. After several changes to the network addressing, routing scheme, DHCP services, NTP services, layer 2 connectivity, FHRP services, and device security, a trouble ticket has been opened indicating that Client 1 cannot ping the 209.65.200.241 address.

Use the supported commands to isolated the cause of this fault and answer the following questions.

On which device is the fault condition located?

A. R1

B. R2

C. R3

D. R4

E. DSW1

F. DSW2

G. ASW1

H. ASW2

Answer: D

Explanation:

The EIGRP AS number configured on R4 is wrong.


New Questions 11

The implementation group has been using the test bed to do an IPv6 'proof-of- concept1. After several changes to the network addressing and routing schemes, a trouble ticket has been opened indicating that the loopback address on R1 (2026::111:1) is not able to ping the loopback address on DSW2 (2026::102:1).

The fault condition is related to which technology?

A. NTP

B. IP DHCP Server

C. IPv4 OSPF Routing

D. IPv4 EIGRP Routing

E. IPv4 Route Redistribution

F. IPv6 RIP Routing

G. IPv6 OSPF Routing

H. IPV4 and IPV6 Interoperability

I. IPv4 layer 3 security

Answer: G

Explanation:

As explained earlier, the problem is with route redistribution on R4 of not redistributing RIP routes into OSPF for IPV6.

Topic 21, Ticket 16: IPv6 Routing Issue 3

Topology Overview (Actual Troubleshooting lab design is for below network design)

u2711 Client Should have IP 10.2.1.3

u2711 EIGRP 100 is running between switch DSW1 & DSW2

u2711 OSPF (Process ID 1) is running between R1, R2, R3, R4

u2711 Network of OSPF is redistributed in EIGRP

u2711 BGP 65001 is configured on R1 with Webserver cloud AS 65002

u2711 HSRP is running between DSW1 & DSW2 Switches

The company has created the test bed shown in the layer 2 and layer 3 topology exhibits. This network consists of four routers, two layer 3 switches and two layer 2 switches.

In the IPv4 layer 3 topology, R1, R2, R3, and R4 are running OSPF with an OSPF process number 1.

DSW1, DSW2 and R4 are running EIGRP with an AS of 10. Redistribution is enabled where necessary.

R1 is running a BGP AS with a number of 65001. This AS has an eBGP connection to AS 65002 in the ISPu2021s network. Because the companyu2021s address space is in the private range. R1 is also providing NAT translations between the inside (10.1.0.0/16 & 10.2.0.0/16) networks and outside (209.65.0.0/24) network.

ASW1 and ASW2 are layer 2 switches.

NTP is enabled on all devices with 209.65.200.226 serving as the master clock source. The client workstations receive their IP address and default gateway via R4u2021s DHCP server.

The default gateway address of 10.2.1.254 is the IP address of HSRP group 10 which is

running on DSW1 and DSW2.

In the IPv6 layer 3 topology R1, R2, and R3 are running OSPFv3 with an OSPF process number 6.

DSW1, DSW2 and R4 are running RIPng process name RIP_ZONE.

The two IPv6 routing domains, OSPF 6 and RIPng are connected via GRE tunnel running over the underlying IPv4 OSPF domain. Redistrution is enabled where necessary.

Recently the implementation group has been using the test bed to do a u2021proof-of-conceptu2021 on several implementations. This involved changing the configuration on one or more of the devices. You will be presented with a series of trouble tickets related to issues introduced during these configurations.

Note: Although trouble tickets have many similar fault indications, each ticket has its own issue and solution.

Each ticket has 3 sub questions that need to be answered & topology remains same. Question-1 Fault is found on which device,

Question-2 Fault condition is related to,

Question-3 What exact problem is seen & what needs to be done for solution

=====================================================================


New Questions 12

The implementation group has been using the test bed to do an IPv6 'proof-of-concept1. After several changes to the network addressing and routing schemes, a trouble ticket has been opened indicating that the loopback address on R1 (2026::111:1) is not able to ping the loopback address on DSW2 (2026::102:1).

Use the supported commands to isolate the cause of this fault and answer the following question.

What is the solution to the fault condition?

A. Under the interface Tunnel34 configuration delete the tunnel mode ipv6 command.

B. Under the interface Serial0/0/0.34 configuration enter the ipv6 address 2026::34:1/122 command.

C. Under the interface Tunnel34 configuration enter the ip address unnumbered Serial0/0/0.34 command.

D. Under the interface Tunnel34 configuration delete the tunnel source Serial0/0/0.34 command and enter the tunnel source 2026::34:1/122 command.

Answer: A

Explanation:

As explained earlier, the problem is with route misconfigured tunnel modes on R3. R3 is using tunnel mode ipv6, while R4 is using the default of GRE. We need to remove the u201ctunnel mode ipv6u201d command under interface Tunnel34


P.S. Easily pass 300-135 Exam with Examcollectionplus 100% Correct Dumps & pdf vce, Try Free: https://www.examcollectionplus.net/vce-300-135/ (146 New Questions)