Q1. Which three components are needed to implement FCoE? (Choose three.) 

A. FCoE Initialization Protocol 

B. N_Port virtualization 

C. N_Port ID virtualization 

D. converged network adapter 

E. priority flow control 

Answer: A,D,E 

Q2. Which is a structure that provides the equivalent of physical fabric separation in Cisco MDS 9000 Series Fibre Channel Switches? 

A. VLAN 

B. VSAN 

C. Zone 

D. FLOGI 

E. LUN 

Answer:

Q3. Which three items are needed to perform the initial setup for a Cisco Data Center device? (Choose three.) 

A. IP address and network mask 

B. FTP password 

C. Active Directory password 

D. console cable 

E. device software licenses 

F. admin password to assign to the device 

G. SFP+ cables 

Answer: A,D,F 

Q4. Which is the correct port type for a Fibre Channel HBA connected to a Fibre Channel hub? A. H_Port 

B. N_Port 

C. E_Port 

D. NL_Port 

E. NP_Port 

F. FL-Port 

Answer:

Q5. An engineer is configuring a new MDS switch. The switch is powered on, the customer connects to the console, and the initial setup script is started. Which two items can be configured during this setup process? (Choose two.) 

A. default switchport interface state 

B. default zone mode 

C. default port-channel mode 

D. default storage VDC 

E. default port VSAN membership 

Answer: A,B 

Q6. Which three devices can participate in multihop FCoE? (Choose three.) 

A. Cisco Nexus 7000 Series Switches 

B. Cisco Nexus 5000 Series Switches 

C. Cisco Nexus 4900 Series Switches 

D. Cisco Nexus 1000 Series Switches 

E. Cisco MDS 9500 Series Switches 

Answer: A,B,E 

Q7. {exhibit 1805} 

Refer to the exhibit. NP uplink ports connected to the core NPIV switch do not come online and are stuck in an initializing state. What is the cause that NP Uplink ports on NPV edge switch are stuck in initializing state? 

A. The upstream NP Ports and the downstream server F Ports on the NPV edge switch may not be in the same VSA. 

B. The core switch has not been enabled for NPIV. 

C. The upstream VSAN ports and the server ports are in full duplex mode. 

D. Related VSAN identifier is not allowed on Virtual Port Channels toward the edge switch. 

Answer: