aiotestking uk

650-127 Exam Questions - Online Test


650-127 Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

P.S. Actual 650-127 braindumps are available on Google Drive, GET MORE: https://drive.google.com/open?id=1rWKdNA5oegmiTbUpjUWBpanQsc-yak00


New Cisco 650-127 Exam Dumps Collection (Question 1 - Question 10)

New Questions 1

Why is IEC 61850 important within the energy / utility industry?

A. the latest Cisco product for connected grid security

A. B. define industry standard for design of electrical substations

C. a law recently passed in the United States

D. a new routing protocol for electricity

Answer: B


New Questions 2

What is Cisco's overall vision with respect to communications protocols?

A. To design and architect end-to-end communications infrastructure using confusing communication protocols.

B. To design and architect end-to-end communications infrastructure using foreign communication protocols.

C. To design and architect end-to-end communications infrastructure using open standard communication protocols.

D. To design and architect end-to-end communications infrastructure using proprietary communication protocols.

Answer: C


New Questions 3

Which of these options includes the two major areas of the network within a substation in the Substation Automation architecture?

A. the electrical network and the data network

B. the primary WAN and the secondary WAN

C. the secure access side and the open access side

D. the station bus and the multi service Ethernet ring

Answer: D


New Questions 4

Which part of the sales cycle is not supported by the Smart Grid PDI Help Desk?

A. planning

B. design

C. operation

D. implementation

Answer: C


New Questions 5

Which product(s) are included in the first Cisco Smart Grid product offerings?

A. all existing Cisco products

B. Cisco Smart Grid 3000 ruggedized switching platform

C. Cisco Connected Grid Router 2010 and Connected Grid Switch 2520

D. ISR 2900 series and Catalyst 2960

Answer: C


New Questions 6

Which two data flows are used with Substation Automation with GOOSE?

A. IED RTU and IED MU

B. IED IED and IED RTU

C. IEDMU and IED IED

D. IED HMI and IED IED

Answer: A


New Questions 7

Which of the following models supports Power over Ethernet?

A. CGS-2520-24TC

B. CGS-2520-16S-8PC

C. All CGS models

D. None of the model supports POE

Answer: B


New Questions 8

Cisco recommends that you always start to populate the Cisco CGR 2010 from which slot?

A. Slot 0

B. Slotl

C. Slot 2

D. Slot 3

Answer: A


New Questions 9

What are features controlled on the Cisco CGR 2010?

A. PAK license

B. license soft key

C. ISO image

D. hardware key

Answer: B


New Questions 10

Which trend is driving the move toward Smart Grid?

A. increases in supply, which requires the integration of distributed generation sources

B. increasing carbon footprint

C. compliance with regulations involving government funding and rules

D. reduced demand, which causes an increase in demand and peak load

Answer: C


Recommend!! Get the Actual 650-127 dumps in VCE and PDF From Surepassexam, Welcome to download: https://www.surepassexam.com/650-127-exam-dumps.html (New 56 Q&As Version)