New Questions 1
Why is IEC 61850 important within the energy / utility industry?
A. the latest Cisco product for connected grid security
A. B. define industry standard for design of electrical substations
C. a law recently passed in the United States
D. a new routing protocol for electricity
Answer: B
New Questions 2
What is Cisco's overall vision with respect to communications protocols?
A. To design and architect end-to-end communications infrastructure using confusing communication protocols.
B. To design and architect end-to-end communications infrastructure using foreign communication protocols.
C. To design and architect end-to-end communications infrastructure using open standard communication protocols.
D. To design and architect end-to-end communications infrastructure using proprietary communication protocols.
Answer: C
New Questions 3
Which of these options includes the two major areas of the network within a substation in the Substation Automation architecture?
A. the electrical network and the data network
B. the primary WAN and the secondary WAN
C. the secure access side and the open access side
D. the station bus and the multi service Ethernet ring
Answer: D
New Questions 4
Which part of the sales cycle is not supported by the Smart Grid PDI Help Desk?
A. planning
B. design
C. operation
D. implementation
Answer: C
New Questions 5
Which product(s) are included in the first Cisco Smart Grid product offerings?
A. all existing Cisco products
B. Cisco Smart Grid 3000 ruggedized switching platform
C. Cisco Connected Grid Router 2010 and Connected Grid Switch 2520
D. ISR 2900 series and Catalyst 2960
Answer: C
New Questions 6
Which two data flows are used with Substation Automation with GOOSE?
A. IED RTU and IED MU
B. IED IED and IED RTU
C. IEDMU and IED IED
D. IED HMI and IED IED
Answer: A
New Questions 7
Which of the following models supports Power over Ethernet?
A. CGS-2520-24TC
B. CGS-2520-16S-8PC
C. All CGS models
D. None of the model supports POE
Answer: B
New Questions 8
Cisco recommends that you always start to populate the Cisco CGR 2010 from which slot?
A. Slot 0
B. Slotl
C. Slot 2
D. Slot 3
Answer: A
New Questions 9
What are features controlled on the Cisco CGR 2010?
A. PAK license
B. license soft key
C. ISO image
D. hardware key
Answer: B
New Questions 10
Which trend is driving the move toward Smart Grid?
A. increases in supply, which requires the integration of distributed generation sources
B. increasing carbon footprint
C. compliance with regulations involving government funding and rules
D. reduced demand, which causes an increase in demand and peak load
Answer: C