New Cisco 650-127 Exam Dumps Collection (Question 2 - Question 11)

Question No: 2

Which statement is correct concerning Goose messaging?

A. K provides Type-1 messages at a 3- to 10-second delay.

B. It uses of cost-effective, well-known protocols (Ethernet and IP).

C. It is a proprietary protocol.

D. ft has no data monitoring.

Answer: A


Question No: 3

Which of the following is NOT a typical business driver for upgrading Substation communications networks?

A. reducing operational expenses

B. industry regulation and standards compliance overall grid reliability

C. generating new revenues for the utility

Answer: C


Question No: 4

Which of these is a grouping of elements that are part of the Cisco Substation Automation solution?

A. data center and customer call centers

B. customer call centers, electrical auto recharging, home energy management

C. protection and control, grid monitoring, multi service communications networks

A. D. multi service communications networks

E. protection and control, auto meter reading, data analysis

Answer: C


Question No: 5

Hat is the most common deployment network requirement for precise timing distribution?

A. broadband and fiber

B. integration with LDAP

C. segmentation (isolation of critical data)

D. GPS clock at substation with IRIG-B

Answer: D


Question No: 6

Which of these describes the overall vision of the Cisco Smart Grid?

A. Create a single infrastructure for Unified Communications from electrical generation plants to all primary and secondary substations.

B. Integrate intelligent routing protocols into existing electrical grids.

C. Sell existing Cisco IP-based products to be used from end-to-end in our utility customer smart grid deployments.

D. Design and architect an end-to-end communications infrastructure integrated with the power.

Answer: A


Question No: 7

Which option is NOT one of the business drivers behind trends in the Global Energy Market?

A. Cost of doing business

B. Aging infrastructure and workforce

C. Changing Grid Architecture

D. Global warming

A. E. New Consumer Interaction Model

Answer: E


Question No: 8

How many power supply slots are available on each Cisco CGR 2010 chassis?

A. 1 slot

B. 4 slots

C. 2 slots

D. No slots because all power is integrated over IP.

Answer: C


Question No: 9

Which statement is correct?

A. Cisco CGS 2520 switches support advanced QOS functionality for proper handling of all station bus traffic.

B. Cisco CGS 2520 switches do not support any QoS function.

C. Cisco CGS 2520 switches support advanced QoS functionality for proper handling of all traffic.

D. Cisco CGS 2520 switches support advanced QoS functionality for proper handling of SCADA traffic.

Answer: D


Question No: 10

What are the two different types of console ports available? (Choose two.)

A. Network

B. USB

C. RJ45

D. Firewall

Answer: B,C


Question No: 11

What is the correct time delay for a critical GOOSE Type-1 message?

A. There is no specific time delay requirement.

B. Fewer than 10 ms

C. Less than 4 to 7 s

D. Less than 3 to 10ms

Answer: D