Q1. DRAG DROP - (Topic 3) 

You need to recommend a storage fabric configuration for VMM. The solution must meet the requirements for the planned private cloud infrastructure. 

Which three actions should you recommend performing in sequence? (To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer:  

Q2. - (Topic 4) 

You need to deploy Hyper-V hosts to meet the requirements for the private cloud infrastructure. 

What should you install on Server6? 

A. Windows Deployment Services (WDS) 

B. Windows Assessment and Deployment Kit (Windows ADK) 

C. Microsoft Deployment Toolkit (MDT) 

D. Windows Automated Installation Kit {Windows AIK) 

Answer:

Topic 5, Proseware, Inc 

Overview 

Proseware, Inc. is an international publishing company. 

Proseware has four data centers and 80 offices. The data centers are located in Dallas, 

Dublin, Bangalore, and Sydney. The offices are located worldwide. 

Existing Environment 

Network Infrastructure 

The network contains a single-domain Active Directory forest named proseware.com. 

Each server has a Baseboard Management Controller (BMC) installed. 

Database administrators in the Bangalore data center manage all of the SQL Server servers in the data centers. 

Dublin Data Center 

The Dublin data center contains two servers. The servers are configured as shown in the following table. 

Operations Manager 2007 R2 agents are installed on all of the servers in the Dublin data center by using the push installation method. 

App1 

Proseware uses a critical business application named Appl. Multiple instances of App1 are deployed to each data center. 

Each instance of App1 consists of the following physical servers that run Windows Server 

2012: 

. A database server that runs SQL Server 2008 R2 

. Two web servers that are load balanced by using the Network Load Balancing 

(NLB) feature. Each web server has a single network adapter. 

New versions of App1 are released at least four times a year. 

When a new version of App1 is released, all of the servers in App1 must be redeployed. 

Requirements 

Planned Changes 

Proseware plans to deploy all System Center 2012 components. 

Proseware plans to implement the following changes in each data center: 

Deploy a SQL Server 2008 R2 Enterprise failover cluster. 

Store all virtual machine data in a Fibre Channel SAN infrastructure. 

Deploy a highly available Virtual Machine Manager (VMM) environment. 

Deploy one physical server that has Data Protection Manager (DPM) deployed. 

Technical Requirements 

Proseware identifies the following technical requirements for the implementation of a private cloud: 

All Hyper-V hosts must be added to a failover cluster automatically. 

The deployment of Hyper-V hosts to each data center must be automated. 

The implementation of the DPM infrastructure must meet the following 

requirements: 

Backups will be stored on an iSCSI SAN. 

Virtual machines in a running state must be backed up from their respective host. 

Administrators must be able to restore individual files from host backups on virtual 

machines configured as file servers. 

The implementation of the Operations Manager 2012 infrastructure must meet the 

following requirements: 

Operations Manager monitoring must not be affected if a single server fails. 

Existing data must be retained in the Operations Manager 2012 infrastructure. 

Existing agents must continue to report to Operations Manager during the upgrade 

process. 

All Operations Manager agents must report to a local management server in their 

respective data center. 

The service desk in the Dublin data center must be able to view the status of the 

servers in all of the data centers. 

Administrative Requirements 

Proseware identifies the following administrative requirements: 

An administrator must be notified when an error occurs on a server. 

An administrator must be able to assign errors to specific administrators for 

resolution. 

Errors that remain unresolved for more than 10 hours must be escalated 

automatically to another administrator. 

Planned Virtual Machines 

The servers in each instance of App1 will be replaced with a set of virtual machines. The planned changes must meet the following requirements: 

  Each instance must be redeployed when a new version of App1 is released. 

  Each instance of App1 must be installed by using the minimum amount of administrative effort. 

App2 

An application named App2 is hosted on the virtual machines in a Windows Azure public cloud infrastructure. 

  The performance and availability of the components of App2 must be monitored centrally. Administrators must be able to modify the configurations of the App2 components. 

App3 

    A service template will be used to deploy multiple instances of a multi-tier application named App3. The vendor of App3 will provide updates to App3 every two months. 

SQL Server Deployment Requirements 

VMM administrators plan to deploy many virtual machines that have SQL Server deployed. The administrators identify the following deployment options for the virtual machines: 

. The virtual machines will host databases that will be created by using data-tier application (DAC) packages. 

. The virtual machines will have SQL Server 2008 R2 Standard deployed by using one of six different configurations. 

. The operating system for the virtual machines will be either Windows Server 2008 R2 Enterprise or Windows Server 2008 R2 Standard. 

Q3. - (Topic 1) 

You need to identify what you require from the vendor of the hardware load balancer to support the planned changes. 

What should you identify? 

A. A driver 

B. A provider 

C. A Management Information Base (MIB) 

D. A management tool 

Answer:

Q4. DRAG DROP - (Topic 6) 

You need to implement the resiliency requirements for the Hyper-V hosts. 

Which four cmdlets should you run in sequence? To answer, move the appropriate cmdlets from the list of cmdlets to the answer area and arrange them in the correct order. 

Answer:  

Q5. - (Topic 7) 

Your company has a datacenter in Los Angeles. 

The datacenter contains a System Center 2012 infrastructure that contains the following roles: 

Orchestrator 

Service Manager 

Virtual Machine Manager(VMM) 

The company is evaluating an auditing policy. 

You need to recommend a portal that must be used to ensure that the following tasks are audited: 

When an administrator updates a service 

When a user requests a change to a service 

When an administrator approves a change to a service 

You need to recommend a solution that meets the requirements of the compliance policy. 

Which portal should you include in the recommendation? 

A. The Service Manager Self-Service Portal 

B. The Virtual Machine Manager Self-Service Portal (VMMSSP) 2.0 

C. The Virtual Machine Manager Self-Service Portal (VMMSSP) 

D. The App Controller portal 

Answer:

Q6. - (Topic 7) 

You have a deployment of System Center 2012 R2 Virtual Machine Manager (VMM). 

You plan to use the Create Clustered File Server Wizard to create a cluster on two physical servers named Server1 and Server2. The new cluster will be named Cluster1 and will have a virtual IP (VIP) of 10.20.30.13. 

When you attempt to deploy the new cluster, you receive the following error message in the job window: "Error (26568) The IP address 10.20.30.13 could not be allocated from any IP address pool." 

You need to ensure that you can deploy the cluster. 

What should you do? 

A. Create a new logical network IP pool and add the IP address to the new pool. 

B. Create a new VIP template profile. 

C. Add the IP address to the VIP section of the logical network IP pool. 

D. Create a DHCP reservation for the IP address. 

Answer:

Q7. - (Topic 5) 

You need to recommend a solution to deploy a complete instance of App1 when a new version of App1 is released. 

What should you include in the recommendation? 

A. A service template 

B. A virtual machine template 

C. A web deployment package 

D. A Microsoft Application Virtualization (App-V) package 

Answer:

Explanation: Ref: http://technet.microsoft.com/en-us/library/gg675106.aspx http://technet.microsoft.com/en-us/library/gg675089.aspx 

Q8. DRAG DROP - (Topic 1) 

You need to configure the storage fabric to support the deployment of the virtual machines. The solution must meet the cloud requirements. 

Which three actions should you perform in sequence? (To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer:  

Q9. HOTSPOT - (Topic 7) 

Your network contains a server named Srv6 that has System Center 2012 App Controller installed. 

You log on to the App Controller portal. 

You need to modify the diagnostic logging level. 

What should you select from the App Controller portal? 

To answer, select the appropriate option in the answer area. 

Answer:  

Q10. - (Topic 2) 

You need to implement the Service Manager Self-Service Portal. 

What should you do? 

A. Install the web content server on SCSM01. Install the SharePoint Server Web Parts on APP01. 

B. Install the web content server and the SharePoint Server Web Parts on SCSM01. 

C. Install the web content server on WEB01. Install the SharePoint Server Web Parts on WFE01. 

D. Install the web content server and the SharePoint Server Web Parts on WEB01. 

Answer:

Explanation: 

Note: 

SharePoint Server 2010 is required so the SharePoint Server Web Parts should be 

installed on WFE01.