aiotestking uk

CLSSGB Exam Questions - Online Test


CLSSGB Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

Cause all that matters here is passing the GAQM CLSSGB exam. Cause all that you need is a high score of CLSSGB Certified Lean Six Sigma Green Belt (CLSSGB) exam. The only one thing you need to do is downloading Certleader CLSSGB exam study guides now. We will not let you down with our money-back guarantee.

Free CLSSGB Demo Online For GAQM Certifitcation:

NEW QUESTION 1
Those who are trained to the skill levels of a Black Belt are typically utilized to apply Lean Six Sigma methodologies what percentage of their time?

  • A. 25%
  • B. 50%
  • C. 75%
  • D. 100%

Answer: D

NEW QUESTION 2
Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?

  • A. Money is being spent
  • B. Waste is being generated
  • C. People are producing value added product
  • D. Waste is being eliminated

Answer: B

NEW QUESTION 3
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

  • A. Moving Average Chart
  • B. Multi-Vari Chart
  • C. X bar Chart
  • D. Pareto Chart

Answer: A

NEW QUESTION 4
A 1-Sample t-test is used to compare an expected population Mean to a target.

  • A. True
  • B. False

Answer: A

NEW QUESTION 5
The use of station warning lights, tool boards and jidohka devices in the application of Lean accomplish which of these principles?

  • A. Pilferage Minimization
  • B. Visual Factory
  • C. Management Awareness
  • D. Operator Attentiveness

Answer: B

NEW QUESTION 6
Which element of waste best describes "the unnecessary movement of materials and/or goods"?

  • A. Overprocessing
  • B. Motion
  • C. Conveyance
  • D. Correction

Answer: C

NEW QUESTION 7
The essence of Lean is to concentrate effort on removing waste while improving process flow to achieve speed and agility at lower cost.

  • A. True
  • B. False

Answer: A

NEW QUESTION 8
Which of these statements describe an undesirable situation when implementing SPC? (Note: There are 2 correct answers).

  • A. The lower Control Limit for the R chart is equal to zero
  • B. The Control Limits are wider than the customer specification limits
  • C. A process is in Statistical Control before implementation of SPC
  • D. Attempt to use SPC for tracking transaction times at a warehouse
  • E. Indication of the specification limits on the Control Chart

Answer: BE

NEW QUESTION 9
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

  • A. Individual-Moving Range
  • B. Xbar-R Charts
  • C. Xbar-S Charts
  • D. nP and P Charts

Answer: B

NEW QUESTION 10
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.

  • A. True
  • B. False

Answer: B

NEW QUESTION 11
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

  • A. Individual—Moving Range
  • B. Xbar-R Charts
  • C. Xbar-S Charts
  • D. nP and P Charts

Answer: B

NEW QUESTION 12
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a __________.

  • A. Data Forward Plot
  • B. Bag Plot
  • C. Min/Max Plot
  • D. Time Series Plot

Answer: D

NEW QUESTION 13
Lean focuses on the sequence of activities and work required to produce a product or a service. This flow is called a __________.

  • A. Value-add Flow
  • B. Production Map
  • C. Value Stream
  • D. Operating Procedure

Answer: C

NEW QUESTION 14
The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.

  • A. True
  • B. False

Answer: A

NEW QUESTION 15
Which statement(s) describe an undesirable situation when implementing SPC?

  • A. The lower Control Limit for the R chart is equal to zero
  • B. Attempt to use SPC for tracking transaction times at a warehouse
  • C. A process is in Statistical Control before implementation of SPC
  • D. The Control Limits are wider than the customer specification limits

Answer: D

NEW QUESTION 16
The __________ is important because it provides an estimate of the probability of an event occurring
depending on the Standard Deviation from the Mean.

  • A. Shewhart Principle
  • B. Pareto Rule
  • C. Mean/Mode Spread
  • D. Empirical Rule

Answer: D

NEW QUESTION 17
A Stable process is a process whose output is consistent over time. A primary tool used to analyze Stability would be a __________.

  • A. Data Forward Plot
  • B. Bag Plot
  • C. Min/Max Plot
  • D. Time Series Plot

Answer: D

NEW QUESTION 18
......

100% Valid and Newest Version CLSSGB Questions & Answers shared by Surepassexam, Get Full Dumps HERE: https://www.surepassexam.com/CLSSGB-exam-dumps.html (New 200 Q&As)