Q1. - (Topic 2) 

You plan to conduct a test for a multi-tier ASP.NET website by using Microsoft Test Manager (MTM). You have created a test plan named Release 1.0. 

Under the Release 1.0 test plan, the test run should: 

. Collect information about all machines on which the test is run, and 

. Collect each UI action performed within the Client role. 

You need to configure the Release 1.0 test plan to meet these requirements. 

What should you do? 

A. Create new test settings for Manual Tests by using the client and server roles. Select the System information and Action log diagnostic data adapters. 

B. Create new test settings for Automated Tests on the local machine. Select the IntelliTrace and Action Log diagnostic data adapters. 

C. Create new test settings for Automated Tests by using the client and server roles. Select the ASP.NET profiler and Code coverage diagnostic data adapters. 

D. Create new test settings for Manual Tests on the local computer. Select the System information and Code coverage diagnostic data adapters. 

Answer:

Q2. DRAG DROP - (Topic 2) 

You are a software quality manager. Your company is using Microsoft Visual Studio to develop an application. 

Your development team is almost finished with its first iteration. The testing team is preparing to verify that the product requirements are met. 

You need to test the requirements. 

Which three actions should you perform in sequence? To answer, move the correct actions from the list of actions to the answer area and arrange them in the correct order. 

Answer:  

Q3. - (Topic 2) 

Your organization uses Microsoft Visual Studio Team Foundation Server (TFS) 2013. You 

are working with tests in the TFS Web Access. 

You have an existing test that uses the following parameters: @city, @state, and @postal 

code. 

You want to use the same parameters in a new test case. 

Which two actions should you perform? Each correct answer presents part of the solution. 

A. In the original test case, select convert to shared parameters. 

B. Open the original test case, and copy the parameters. 

C. Open the new test case, and paste the parameters. 

D. In the new test case, select add a shared parameter set. 

Answer: A,B 

Explanation: http://msdn.microsoft.com/en-us/library/dd997832.aspx 

Q4. - (Topic 3) 

You are using the Microsoft Visual Studio Scrum 2.0 process template. You recently finished a sprint. 

You need to conduct a retrospective meeting prior to planning the next sprint. 

What should you do? 

A. Analyze and revise the story points of the work items completed in the previous sprint. 

B. Analyze the previous sprint to identify what the team is going to do differently during the next sprint. 

C. Analyze items in the product backlog for the next sprint. 

D. Determine which items have been finished on the previous sprint. 

Answer:

273. - (Topic 3) 

You manage a development team that uses the Microsoft Visual Studio Scrum 2.0 process template. 

You establish a product backlog, allocate backlog items for a sprint, and define the tasks required to complete the sprint. 

You need to ensure that the agreed upon work is assigned to team members. 

Who should be responsible for assigning work to team members? 

A. Team members 

B. Product owner 

C. Scrum master 

D. Team lead 

Q5. - (Topic 3) 

Your team uses Microsoft Visual Studio Team Foundation Server {TFS) to manage your software projects. The operations team uses System Center Operations Manager (SCOM) and configures synchronization with TFS by using TFS Work Item Synchronization Management Pack. 

You need to send information about production errors, including IntelliTrace information from System Center, to the software development team. 

What are two possible ways to achieve this goal? Each correct answer presents a complete solution. 

A. Assign an existing Application Error from System Center to the development team by using the TFS connector and opening an error alert. Select the Assign to Engineering option from the Alert Status menu. 

B. From System Center, select an existing alert, and enable full IntelliTrace collection by using the tasks panel. Once the IntelliTrace file is associated to the alert select the Assign to Engineering option from the Alert Status menu. 

C. From the TFS Administration Console, select the Import IntelliTrace files menu, and associate the IntelliTrace file to a new work item. 

D. From System Center, select an existing alert, and enable the full IntelliTrace collection by using the tasks panel. Once the IntelliTrace file is associated to the alert, create a new work item in TFS, and add a link to the new System Center alert. 

Answer: B,D 

284. - (Topic 3) 

You are a lead developer for your company. You are responsible for a managed application with an existing codebase. 

Customers report that the software is unstable. Management wants you to lead an effort to add unit testing to the application. 

You need to identify the part of the application that will benefit most from adding unit tests. The goal is to achieve better software quality for the most users. 

Which section of code should you target? More than one answer choice may achieve the goal. Select the BEST answer. 

A. code that has remained unchanged for years 

B. code that is complicated but rarely executed 

C. code that was recently added to the project 

D. code to which many bug reports have been traced 

Q6. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server and a virtual test infrastructure that uses Lab Manager 2012 and System Center Virtual Machine Manager (SCVMM) 2010. 

A new Hyper-V based virtual test environment is added to your network environment with its own SCVMM server. 

You need to reconfigure TFS to use the new SCVMM instance. 

What should you do? 

A. Run the TFS[.abContig.exe command. 

B. Use the TFS Administration Console. 

C. Use the Visual Studio Test Controller Configuration Tool. 

D. Use Microsoft Test Manager (MTM) in Lab Center mode. 

Answer:

Q7. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution 

Framework (MSF) for Agile Software Development process template. 

You want to organize your test cases by relating them to the user stories for the application 

under test. 

You need to use a test suite that creates the Tests link type as you add test cases. 

Which type of test suite should you create? 

A. Static 

B. Query-based 

C. Linked 

D. Requirements-based 

Answer:

Q8. - (Topic 3) 

You are planning to develop a new application. 

You need to ensure that the code is easy to test and obtain high code coverage. 

What should you do? 

A. Create as many static methods as possible. 

B. Create a fake for each class that you are testing. 

C. Ensure that concrete classes depend only on other concrete classes. 

D. Ensure that each class has only one responsibility. 

Answer:

Q9. - (Topic 2) 

You are using Microsoft Test Manager (MTM). 

You need to assign test cases to testers so they will be able to find the tests they need to run. 

What should you do? 

A. Click Assign to designate the tester for each test case, then click Filter when you run the test. 

B. In the Assigned to field for each test case, select the tester, then click Filter when you run the test. 

C. For each test case, select the tester in the Assigned to field and use a work item query to filter on assigned test cases. 

D. Create a test plan for each tester. 

Answer:

Q10. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Capability Maturity Model Integration (CMMI) Process Improvement process template. Your Team Foundation Server (TFS) 2012 server is configured to support reporting. 

You are tracking testing progress for the requirements in the iteration. 

You need to identify the report that provides the following: 

Verify that all requirements are covered by test cases. 

Determine the number of hours of work remaining for each requirement. 

Determine the percentage of completion for each requirement. 

Determine the number of bugs for each requirement. 

Which report should you use? 

A. Requirements Overview 

B. Test Case Readiness 

C. Remaining Work 

D. Test Plan Progress 

Answer:

....