aiotestking uk

70-499 Exam Questions - Online Test


70-499 Premium VCE File

Learn More 100% Pass Guarantee - Dumps Verified - Instant Download
150 Lectures, 20 Hours

Q1. - (Topic 1) 

You use Microsoft Visual Studio Team Foundation Server (TFS). Your project has two 

teams, Team A and Team B. AH team members are part of the global contributors group. 

Your project administrator sets up a work item query folder for Team A. 

You need to configure the query folder so that only Team A members have access. 

Which two actions should you perform? Each correct answer presents part of the solution. 

A. Set Global Contributors to Not Set. 

B. Set Global Contributors to Allow. 

C. Set Team A to Explicit Allow. 

D. Set Team B to Deny. 

Answer: C,D 

Explanation: http://msdn.microsoft.com/en-us/library/dd286628(v=vs.100).aspx 

Q2. - (Topic 2) 

You are using Microsoft Test Manager (MTM). 

Your company has configured multiple test configurations. 

You need to set all active test configurations as the default for all new test plans. 

What should you do? 

A. Select the Active state option for each test configuration. 

B. Select the Default option for each test configuration. 

C. Select multiple test configurations from the test plan. 

D. Select the Assign to new test plans option for each test configuration. 

Answer:

Q3. - (Topic 3) 

You are using the Microsoft Visual Studio Scrum 2.0 process template. You are a scrum master leading a scrum team. 

Your team is new to Agile and Lean practices. 

You need to ensure that your team communicates efficiently. 

Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.) 

A. Utilize visual controls, such as task boards. 

B. Co-locate team members. 

C. Document the design of functionality you plan to build. 

D. Hold a weekly conference call with the entire team to review the bug list. 

E. Discuss issues through an email thread. 

F. Conduct daily face-to-face stand-up meetings. 

Answer: A,B,F 

Q4. - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server named Server1, which has a single team project collection containing a number of team projects. 

You want to outsource some projects to a third-party development team that will connect to Server1 by using a virtual private network (VPN). 

You need to ensure that only the projects the team has access to are available in their team project collection. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. In the TFS Administration Console, select Clone team project collection. 

B. Use the TFSConfig.exe collection /attach CollectionDB: ServerName;DatabaseName /clone command to make a copy of the existing team project collection. 

C. Use the TFSConfiq.exe collection /attach CollectionDB: ServerName;DatabaseName command to make a copy of the existing team project collection. 

D. In the TFS Administration Console, create a new empty team project collection. 

E. Use the TFS Integration Platform to copy the required team projects to the new team project collection. 

F. In the TFS Administration Console, for both the original and cloned team project collections, delete the team projects the respective teams do not need. 

Answer: D,E 

Q5. - (Topic 3) 

Your development team uses Microsoft Visual Studio Team Foundation Server (TFS) 2012 with the Microsoft Framework (MSF) for Capability Maturity Model Integration (CMMI) template. 

You are reviewing outstanding issues with your team and trying to agree on whether you can mark a particular issue as resolved. 

You need to determine whether the issue has been resolved. 

Which two criteria must the team meet before the issue can be marked as resolved? (Each correct answer presents part of the solution. Choose two.) 

A. All impediments under an issue have been completed. 

B. All user stories under an issue have been completed. 

C. Stakeholders are satisfied that the issue has been resolved. 

D. All tasks under an issue have been completed. 

Answer: C,D 

Explanation: Review Issues for Resolution After all tasks under an issue have been completed, the stakeholders should decide whether the issue has been resolved. http://msdn.microsoft.com/en-us/library/ee461539.aspx 

Q6. DRAG DROP - (Topic 1) 

Your team uses Microsoft Visual Studio Team Foundation Server (TFS) to manage automated builds. 

You need to make modifications to one of your build definitions. You want your team to be able to queue new builds, but you want those builds to run only after you complete your changes. 

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order. 

Answer:  

Q7. - (Topic 2) 

... 

You are using Microsoft Test Manager (MTM). You have developed a new test case. 

You need to: 

Set the test case priority, 

Set the area where the test will be used, and 

Update the work item state to Ready. 

What should you do? 

A. Open the Test Configuration Manager view and change the area path, priority, and state. 

B. Open the Test Plan Manager view and change the area path, priority, and state. 

C. Open the test case work item and change the area path, priority, and state. 

D. Open the test plan Properties view and change the area path, priority, and state. 

Answer:

Q8. - (Topic 3) 

You are planning to develop a new application. 

You want to be able to measure the quality of the code you create. 

You need to ensure that it is easy to test and obtain high code coverage. 

What should you do? 

A. Ensure that each class has only one responsibility. 

B. Ensure that concrete classes depend only on other concrete classes. 

C. Create as few abstract classes and interfaces as possible. 

D. Create as many static methods as possible. 

Answer:

Q9. - (Topic 1) 

You are business analyst. You use MS Excel to add and edit work items of a team project. You store those work items in an offline worksheet. 

Recently your team project has been moved to another Team Project Collection. 

You need to connect the Microsoft Excel document containing the work items to the new Team Project Collection. 

What should you do from within Microsoft Excel? 

A. 

Click the Publishing button on the Work Items group within the Team tab. 

When prompted, select the new name of the Team Project Collection. 

B. 

Click the Refresh button on the Work Items group of the Team. 

When prompted, select the new name of the Team Project Collection. 

C. 

Use the Server Connection option in the Configure dropdown of the Work Items group of the Team tab. 

When prompted, select the new name of the Team Project Collection. 

D. 

Disconnect from TFS from within the Team tab. 

Reconnect to TFS from within the Team tab. 

While reconnecting, provide the new name of the Team Project Collection when 

prompted. 

Answer:

Q10. DRAG DROP - (Topic 1) 

Your company is installing Microsoft Visual Studio Team Foundation Server (TFS) 2013 in a new environment. 

Your IT department has 110 developers, 25 business analysts, 50 testers, and 30 Scrum Masters who will access this new instance of TFS in various capacities. 

You need to configure the servers to meet the minimum TFS 2013 system requirements. 

What should you do? To answer, drag the appropriate minimum requirement to the correct component Each minimum requirement may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content 

Answer: