Q1. Which of the following is a benefit of utilizing a type 2 hypervisor to manage guests?

A. The administration of the guest OS is significantly less complex.

B. There is reduced resource overhead since there is no OS layer.

C. A type 2 hypervisor offers increased performance over a type 1 hypervisor.

D. There is increased hardware support since there is an OS layer.

Answer: D

Q2. A system administrator needs to directly control a server that has no network connectivity. Which of the following should be used to accomplish this?

A. SSH

B. KVM

C. RDP

D. iLO/iDRAC

Answer: B

Q3. A technician is installing a rack mounted server into a rack in a datacenter with CRAC units and blanking panels. Blanking panels are used to:

A. lower the UPS power requirements.

B. limit airflow leakage in the rack.

C. limit the amount of servers that will fit into the rack.

D. color match the server color.

Answer: B

Q4. A technician is asked to install an additional NIC in a server. Which of the following hardware considerations would be BEST for the technician to make?

A. Power consumption

B. Bus type and speed

C. CPU stepping

D. CAS latency

Answer: B

Q5. An administrator is updating theserver infrastructure atacompany's disaster recovery site. Currently, an enormous amount of effortisrequired by theadministratorto replicate operations. Which of the followingtypes of siteis the administrator currently using?

A. Cold site

B. Hot site

C. Warm site

D. Replication site

Answer: A

Q6. While performing routine testing of a hot standby site located at a remote hosting center, a system administrator is unable to access one of the server operating systems to verify functionality. Which of the following is MOST applicable to access the host?

A. KVM over IP

B. RDP over HTTP

C. Secure shell

D. Serial console access

E. VNC

Answer: A

Q7. A company has 700 servers installed in 50 server racks in the datacenter. The Chief Technology Officer issued a memorandum to the IT department with a directive to reduce power and cooling consumptions by 50% in the datacenters. Which of the following should thesystemadministrators recommend?

A. Implement 208V 3-phase servers

B. Implement hot aisle / cold aisle

C. Virtualize the servers in the datacenter

D. Replace each server with a blade server

Answer: C

Q8. A system administrator is troubleshooting a network connectivity issue and runs ipconfig/all on the host. The command returns the following:

IPv4 Address: 169.254.0.12

Subnet mask: 255.255.0.0

The client is configured for DHCP. Which of the following commands should be run on the client to resolve this issue? (Select TWO).

A. ipconfig/release

B. tracert

C. ipconfig/flushdns

D. ipconfig/renew

E. ipconfig/showclassid

F. nslookup

Answer: A,D

Q9. A company is planning to replace old hardware and needs to budget accordingly. Which of the following is likely to contain a list of end of life servers?

A. The server's warranty information.

B. The server's life cycle schedule.

C. The asset management database.

D. The software licensing agreement.

Answer: C

Q10. Which of the following is the MOST complex way to directly reduce heat for computing components?

A. Liquid cooling units

B. Integrated high RPM fans

C. Directed airflow with baffles

D. Hot aisle/cold aisle

Answer: A